PROJECT GALLERY

Recently Completed

Precision Engineering Plastics (PEP), Enfield, EN3 7NJ

Client: Precision Engineering Plastics

A major Design & Build project in Enfield. Works included large two-level extension to existing warehouse whilst client remained in full occupation.

Other elements included solid and glazed partition systems to create offices, meeting rooms, WC's, locker rooms and breakout areas, ceilings, major decoration works, A/C installation, small power, data and lighting and various flooring finishes.

Works successfully completed mid-January 2020.

Recently Completed

Stone Personal Training, 230 Brompton Road, SW3 2BB

Client: Stone Personal Training

Internal refurbishment of 2 floors including major redecoration works, layout changes, lighting alterations, bespoke joinery items and various flooring finishes.

The project ran for 3 weeks over the holiday period to minimalise impact for the client and was completed on-time and budget in early Jan 2020.

Designer: Chris Bromfield

Recently Completed

GroupM, Holborn, WC1R 4HQ

Client: GroupM

Phased internal reconfiguration works over two fully occupied floors. Works included layout design alterations, creation of offices and meeting rooms, photo copy and breakout areas, small power and data installations, decoration finishes, flooring and alterations to mechanical services

The phased project ran for 5 months and was succesfully completed in late December 2019.

Completed

Auto Protect, Harlow, Essex 

Client: Auto Protect

Internal reconfiguration works including layout design alterations, creation of glazed meeting room, small power works, furniture installations, feature bespoke design elements and re-carpeting

The project ran for 3 weeks and was completed whilst the client remained in occupation in early December 2019.


Completed 

Stone Personal Training, 52 Cornhill, EC3V 3PD

Client: Stone Personal Training

Internal refurbishment of 3 floors including layout alterations, bespoke design finishes, major redecoration works, plumbing elements, feature lighting & small power and various flooring finishes.

Project ran for 3.5 weeks inc. front-end period of full client occupation - completed early November 2019.

Designer: Chris Bromfield

Completed 

Moet, London, SW1W 0DH

Client: Moet, Belgravia

Internal refurbishment of Moet's 4th & 5th floors within their flagship London offices including reconfiguration of internal partition layouts, small power and lighting, data services, air conditioning alterations, flooring finishes, bespoke design elements, graphic works and major redecoration

Project ran for 10 weeks - completed late-September 2019

Completed

The Float Hub, Shoreditch, EC1V 9NQ

Client: The Float Hub

Major basement fit-out of London's largest designated flotation center including partition systems, full M&E package, flooring finishes, plumbing elements, bespoke design & joinery details, graphics, signage and decoration finishes

Project ran for 12 weeks - completed July 2019. Designer: Chris Bromfield & The Want Room

Completed

3 Tribes, Borough, SE1 1LB

Client: 3 Tribes, Borough

Complete fit-out of hot yoga, barre and floatation center including partition systems, full M&E package, flooring finishes, plumbing elements, bespoke design & joinery elements, graphic, signage and decoration finishes

Project ran for 10 weeks - completed late-April 2019. Designer: Chris Bromfield

Completed

Moet, London, SW1W 0DH

Client: Moet, Belgravia

Internal refurbishment of Moet's staff canteen & breakout area within their flagship London offices including feature glazed partition systems, small power and lighting, flooring finishes, bespoke design elements, graphic works and decoration finishes

Project ran for 8 weeks - completed late-March 2019

 

Completed

Marketing Suite, Copthall Avenue, London

Client: London Wall Marketing Suite

Internal fit-out of a marketing suite for a major development on London Wall including solid partition and suspended ceiling systems, M&E package, bespoke joinery, AV systems, decoration, specialist flooring finishes and refurbishment of the building's main reception & WC areas

Project ran for 10 weeks - completed late-July 2018

Images below are further examples of completed projects...