Monkey Puzzle, Woodford
Client - MTG Building Services
In collaboration with MTG Building Services, Planned Action completed a major fit-out and refurbishment of a former hotel, turning it into a childcare day nursery.
Works included major demolition and structural elements, reconfiguration of floor layouts over three levels, full M&E package, security and access control systems, bespoke joinery items, various flooring finishes and complete redecorations throughout.
Project Duration - 3 months
Completed - September 2021
Tricon Food Services, Romford
Client: Tricon
The client brief was to create 3no. semi-acoustic single-person booths for video and voice calls.
Works completed in an occupied, functioning office included drywall construction with full height glazed doorsets, acoustic baffling works to ceiling void, acoustic wall coverings, small power, lighting and data installations and decoration finishes.
Project Duration - 2.5 Weeks
Completed - August 2021


95 Gresham Street, London
Client: MTG Building Services
In collaboration with MTG, Planned Action completed the refurbishment of a basement area of 95 Gresham Street.
Works included the creation of a Building Management meeting room, blockwork wall decoration, vinyl flooring to corridor areas, small power and lighting upgrades and door protection elements. Works completed over phased in an occupied building.
Project Duration - 4 Weeks
Completed - July 2021


TJX, Watford
Client: BW
In collaboration with BW, Planned Action completed a Day 2 package at TJX's Building X in Watford, Herts.
Works included remodelling to existing offices, the creation of 3 new multi-purpose rooms inc. Optima glazed elevations, feature wall coverings, acoustic panelling, flooring finishes, decoration and M&E installations.
Project Duration - 8 Weeks
Completed - July 2021
Completed
Hilton, Watford

Client: BW
In collaboration with BW, Planned Action completed a Day 2 package following the major refurb works in 2020.
Works included remodelling to existing office layouts, the creation of new offices inc. feature glazed elevations, creation of new executive tea point area, remodelling to microwave and waste bin area, bespoke joinery items, decorations, flooring finishes, AV works and M&E alterations.
The 6-week project was successful completed on-time and on-budget in late March 2021.
Completed
No.1 Kingdom Street, W2 6BD
Client: BW
In collaboration with BW, Planned Action carried out elements of the remodelling of a reception area.
Works included strip-out and wall reconfiguration works, the creation of 3no. focus rooms, feature glazing, MF ceilings incorporating M&E services, decoration & flooring finishes plus general builders works to facilitate M&E trades.
The project was successful completed on-time and on-budget in November 2020.
CompletedLondon School of Economics, Holborn

Client: BW
In collaboration with BW, Planned Action carried out elements of the complete refurbishment of the basement classroom areas at LSE, Holborn.
Works included suspended ceilings, decoration & flooring finishes and general builders works to facilitate M&E installations.
The project reached a successful conclusion in mid-September 2020
Completed
One London Wall, EC2Y 5EB

Client: Collins Construction
In collaboration with Collins Construction and Proactive Joinery Ltd, Planned Action carried out numerous elements in the ground and first floor reception area refurbishments inc. bespoke joinery and feature wall panelling, suspended and MF ceiling installations, specialist decoration finishes and general builder works.
The project was successfully completed on time in late July 2020
Completed
Aspect House, Brighton

Client: Collins Construction
Working in collaboration with Collins Construction, Planned Action carried out the remodelling of the ground floor entrance and reception, created a new MIP compliant WC and shower area and completed major decoration works throughout five floors.
Works also included general building elements and bespoke joinery items
The project was successfully completed on programme in late June 2020, despite the numerous challenges thrown up by the Covid-19 pandemic
Completed
Stockley Park, Uxbridge

Client: Thirdway Contracts
Working in collaboration with Thirdway Contracts, Planned Action completed the Cat A fit-out of a new tenant area on the 1st Floor of No.5, Stockley Park
Works included acoustic drywall partitions, M&E alterations, MF ceilings, flooring, decoration finishes and bespoke wall graphics
Works successfully and safely completed on-time in May 2020 despite the entire construction period during the full Covid-19 lockdown
Completed
Precision Engineering Plastics (PEP), Enfield, EN3 7NJ

Client: Precision Engineering Plastics
A major Design & Build project in Enfield. Works included large two-level extension to existing warehouse whilst client remained in full occupation.
Other elements included solid and glazed partition systems to create offices, meeting rooms, WC's, locker rooms and breakout areas, ceilings, major decoration works, A/C installation, small power, data and lighting and various flooring finishes.
Works successfully completed mid-January 2020.
Completed
Stone Personal Training, 230 Brompton Road, SW3 2BB

Client: Stone Personal Training
Internal refurbishment of 2 floors including major redecoration works, layout changes, lighting alterations, bespoke joinery items and various flooring finishes.
The project ran for 3 weeks over the holiday period to minimalise impact for the client and was completed on-time and budget in early Jan 2020.
Designer: Chris Bromfield
Completed
GroupM, Holborn, WC1R 4HQ

Client: GroupM
Phased internal reconfiguration works over two fully occupied floors. Works included layout design alterations, creation of offices and meeting rooms, photo copy and breakout areas, small power and data installations, decoration finishes, flooring and alterations to mechanical services
The phased project ran for 5 months and was succesfully completed in late December 2019.
Completed
Auto Protect, Harlow, Essex

Client: Auto Protect
Internal reconfiguration works including layout design alterations, creation of glazed meeting room, small power works, furniture installations, feature bespoke design elements and re-carpeting
The project ran for 3 weeks and was completed whilst the client remained in occupation in early December 2019.
Completed
Stone Personal Training, 52 Cornhill, EC3V 3PD

Client: Stone Personal Training
Internal refurbishment of 3 floors including layout alterations, bespoke design finishes, major redecoration works, plumbing elements, feature lighting & small power and various flooring finishes.
Project ran for 3.5 weeks inc. front-end period of full client occupation - completed early November 2019.
Designer: Chris Bromfield
Completed
Moet, London, SW1W 0DH
Client: Moet, Belgravia
Internal refurbishment of Moet's 4th & 5th floors within their flagship London offices including reconfiguration of internal partition layouts, small power and lighting, data services, air conditioning alterations, flooring finishes, bespoke design elements, graphic works and major redecoration
Project ran for 10 weeks - completed late-September 2019
Completed
The Float Hub, Shoreditch, EC1V 9NQ

Client: The Float Hub
Major basement fit-out of London's largest designated flotation center including partition systems, full M&E package, flooring finishes, plumbing elements, bespoke design & joinery details, graphics, signage and decoration finishes
Project ran for 12 weeks - completed July 2019. Designer: Chris Bromfield & The Want Room
Completed
3 Tribes, Borough, SE1 1LB
Client: 3 Tribes, Borough
Complete fit-out of hot yoga, barre and floatation center including partition systems, full M&E package, flooring finishes, plumbing elements, bespoke design & joinery elements, graphic, signage and decoration finishes
Project ran for 10 weeks - completed late-April 2019. Designer: Chris Bromfield
Completed
Moet, London, SW1W 0DH
Client: Moet, Belgravia
Internal refurbishment of Moet's staff canteen & breakout area within their flagship London offices including feature glazed partition systems, small power and lighting, flooring finishes, bespoke design elements, graphic works and decoration finishes
Project ran for 8 weeks - completed late-March 2019
Completed
Marketing Suite, Copthall Avenue, London
Client: London Wall Marketing Suite
Internal fit-out of a marketing suite for a major development on London Wall including solid partition and suspended ceiling systems, M&E package, bespoke joinery, AV systems, decoration, specialist flooring finishes and refurbishment of the building's main reception & WC areas
Project ran for 10 weeks - completed late-July 2018